I have applied for a Telkom ADSL line on 12/04/2013. A deposit of R700 was demanded before they can proceed with the order. I paid the R700 deposit. A technician came out on 23/04/2013. He said that new cabling must be installed. I have received a sms on 26/04/2013 saying that Technical feasibility is being investigated. I have phoned 3 times to find out how long it is still going to take but no one can give me an estimate. Is it really so difficult to get ADSL??
Order number 76594447
0 comments