In October 2022, on Coubrough road, fromm the substation to number 226 Coubrough Road a trench was dug up by municipal workers to repair a fault at the power box. It is now 15 November and the unsightly debris and removed paving is still laying all along all the side of the road and infront of our gates for at least a month now. This is infront of at least 3 houses from the Substation. We were patiently awaiting the municipality to replace the paving and level out the soil that was dugg up.
Please send out a team to come and tidy up this area and fix the paving URGENTLY.