We were forwarded to Neluis by APC Homes in Pta. We wanted to have alterations done to our house. The project started on the 15th Jan 13 and was supposed to be completed by 15th March 13! We've paid over R137, 000 and to date, our floor has failed twice, no walls etc. Labourers have not been paid. I found out after the fact that he has a criminal case against him. So now I sit with only a floor that's cost R137, 000.

He has blamed the site manager for the poor service, but as he is the one holding the money, the site manager can't do anything. It's been so bad that after the 1st failure of the floor, extra concrete was delivered, the workers had gone home and it was myself and the site manager who had to through the concrete as he couldn't arranged the delivery at a decent time.


Company: Naxaphase Construction
Country: South Africa
City: Gauteng
  <     >  

RELATED COMPLAINTS

Planet Fitness
Dangerous and unpleasant gym conditions

Pronto Building Materials
Big company bully a Micro-Enterprise

Kitchen Delights
A renovators nightmare

Hkw Construction
The gift that keeps on giving (NOT!)

Rba Homes
Bad Service

Gordon Ridge Construction
Breach of Contract, Late/No Delivery

Africote
Africote Skreed Floor Failure

Ak Van Der Schyff Building Contractors
Building work failed, he took the money and ran

Rainbow Rainwater Concrete Pumps
FLY BY NIGHT

Inovar Flooring
Great service & product from Inovar Floor Randburg