I hired clearwater pools to re-surface my pool in March 2012. I was assured it would take 3 days when the weather cleared up. The renovation took approximately 4 months to complete. I was told that the balance of 50% had to be paid before the last coat was applied. It was only completed after numerous calls, the sub-contractors used could not be reached most of the time. I have been reporting the light not working and blocked jet since September, the consultant doesn't bother to reply to emails and is silent during phone calls.


Company: Clearwater Pools
Country: South Africa
City: BOKSBURG
  <     >  

RELATED COMPLAINTS

Clearwater Pools
Blaming their contractors

Clearwater Pools
Always Ready to Sell, NEVER ready to service

Clearwater Pools
After one repair the problem wasn't solved

Clearwater Pools
Avoid Clearwater at all Costs

Clearwater Pools
Bad workmanship

Clearwater Pools
Poor service, workmanship and no replies

Clearwater Pools
Contacted by ClearWater pools

Clearwater Pools
Very Happy Custome

Clearwater Pools
Poor Quality of work and Service

Penguin Pools
Incomplete Pool for over 6 Months