They started in March and only ended the work by July / August 20120. They build over my main water pipe which started to leak slowly under the house. We never notice the leak until I received a water bill of R16, 000. I confronted Graham and he said it is not his mistake. He will pay me R5000 to assist, I am still waiting. I had to move the main pipe and pay my water bill. It all came to R25; 000.They mixed the water temperatures on all the new tabs they installed. (Hot is cold and cold is hot) He said how he must know - sorry but that is their work - why did he do the job. I had to pay extra money to get the plans drawn up after he did the work. This was part of the contract. I had to pay the electrician to come and give me a certificate - they messed up all the wiring and it cost me R5000 extra. He said he will install a fire proof door between the house and garage. We believed him, until the inspector came out and said it is not a fire door. I waiting over 4 weeks for him to fix install the new door. I am still waiting for the plumbing and engineering certificate. The inspector will not sign my place off before he gets these docume


Company: Build Solutions
Country: South Africa
City: Randburg
  <     >  

RELATED COMPLAINTS

Ethekwini Water And Sanitation
Terrible service

Verimark
Products not working

City of Tshwane Municipality
Corruption and not doing job properly

Solid Build
LEAKING ROOF AND CRACKED WALL

City Of Cape Town Municipality
Poor maintenance causing water feed problem

Unison Plumbing
Poor work performance

City Of Johannesburg Municipality
No water for more than 24 hours

Ekurhuleni Metropolitan Municipality
Burst pipe and no service from 1 December 2012

City Of Johannesburg Municipality
Large water pipe not repaired days late

Arm Electrical And Plumbing
Broke more than they fixed - Possible