Cupboard Hardware Centre
Dream kitchen turns in to Kitchen nightmare

Construction & Repair

In the course of November 2013 I approached CHC Randburg to design, manufacture and install a new kitchen.
My brief was (1) installation has to be complete by 20 December 2013. (2) Drawers not shelves for bottom cupboards.
I was most impressed with the "service" initially" until i had to pay in full. Installation was to commence 9 Dec 2013 but units only delivered after 5.30pm on 13 Dec 2013. Part installation for the granite to be measured and installed commenced on Sunday 15 Dec after 3pm.. Had to cancel dinner arrangements as they only finished after 10.30pm. Then the following week I waited for them to complete installation as everyday Joey Jones had excuses. Finally Friday 20th December 2013 Alain sends me a text message at 6.35pm to say he will be finished within an hour and then he will be on his way to me after I had told Joey Jones that morning installation had to be complete before 6pm. So Alain wanted to arrive around 8.30pm on a Friday night to work! Next communication was 24 December, the day I was to host Xmas eve dinner with no oven and no kitchen sink. The top cupboards don't line up, granite too narrow and not supported at joins, no drawers. To name but a few


Company: Cupboard Hardware Centre
Country: South Africa
City: Randburg
  <     >  

RELATED COMPLAINTS

Easylife Kitchens
Breach of contract and late delivery

Cupboard Hardware Centre
Shocking service - Cupboard Hardware Centre

Kbs Kitchens
6 Months and still waiting for my kitchen and BIC

Nortje Marble & Granite
Supplier ran off with deposit

Weizter
Beautifull installation

Stonehenge Marble
DON'T USE STONEHENGE GRANITE AND MARBLE

Manny's Timber & Hardware
Always delaying final delivery

Kbs Kitchens
Failure to deliver goods on receiving payment

The Kitchen Factory
Job incomplete

Game
Kitchen units